Mailboxes Repair Update
We have an update on the repair of the mailbox locks, but not what we hoped to share. A Marymoor Trails resident was finally able to speak with someone at the Post Office. The Post Office confirmed there is a work order issued for the new lock swap out. The Post Office said it *could* … Continue reading "Mailboxes Repair Update"
Read MoreAnnual Fire Alarm Testing
Annual Fire Alarm Confidence Testing***NOTICE OF ENTRY***Monday, October 14th, 2024, and Tuesday, October 15th, 2024 On October 14th and 15th, 2024, Fire Protection Inc. will perform the annual fire and life safety system inspections for Marymoor Trails Association. The testing is an NFPA (National Fire Protection Agency) requirement, as well as a requirement for the City of … Continue reading "Annual Fire Alarm Testing"
Read MoreSeptember MMT BOD Meeting
MMT Board of Directors Meeting Monday September 16, 2024 6:00PM via Zoom Interested homeowners are invited to call in and listen to the Marymoor Trails Board of Directors meeting on Monday September 16 at 6:00PM via Zoom. Board meetings are a good way to stay up to date on what’s happening in the association. This … Continue reading "September MMT BOD Meeting"
Read MoreMailboxes Repair Status
Replacement locks are at the Redmond Post Office. We are waiting for the Post Office to install them. We cannot install these ourselves. Background: Due to an attempted break-in, MMT mailbox locks are jammed and cannot be opened by the mail carrier. All mail delivery has been stopped. In the meantime, all MMT mail is … Continue reading "Mailboxes Repair Status"
Read MoreELECTRICAL WORK
Electrical work will be done onsite at Marymoor Trails on Thursday, September 5th starting 6:00am. We do not anticipate any power outages. Electricians from Cochran Electric will be working onsite inspecting electrical vaults and gathering information for possible electrical upgrades. Electricians will be accessing covered vaults, assessing the capacity of our current system. They will … Continue reading "ELECTRICAL WORK"
Read MoreSprinkler Leaks
We have disabled the sprinkler system effective immediately. An issue was reported today where the zone running along the drive downhill around Building I was leaking all day. We attempted several diagnostic procedures to resolve the issue with the zone to no success. This evening we closed the water main to the sprinkler system and … Continue reading "Sprinkler Leaks"
Read MoreMMT Mailboxes Attempted Break-In
All mail delivery has been stopped. Pick up your mail at the Redmond Post Office US Postal Service carrier said when they came to deliver mail on Saturday 8/24/24 the master lock on the left panel was inoperable because someone had tried to drill it out. No mail has been delivered to those mailboxes since … Continue reading "MMT Mailboxes Attempted Break-In"
Read MoreElectrical Power Restored
PSE has completed their work on the vault between Bldgs. M-N and all power has been restored to affected buildings and units.
Read MoreMMT BOD Notes – 7/18/2024
Marymoor Trails Board of Directors Meeting July 18, 2024 The July Board meeting was called to order by Tim Hollingshead at 6:03pm. Attending: Michael Niksa, President; Josh Gibson, Treasurer; Van Chesnutt, Landscape; Linda O’Hara, Secretary; and Tim Hollingshead, Morris Management. Unable to attend: Chris Cho. Also attending: Duane Nakano, volunteer assisting Michael with buildings. Homeowners’ … Continue reading "MMT BOD Notes – 7/18/2024"
Read MoreFire Extinguisher & Backflow Testing
Fire extinguisher and sprinkler system backflow testing are scheduled for 08/19/2024 starting at 8am. There should be no impact to homeowners as the fire extinguishers are outside adjacent to the garages and the sprinkler backflow system is adjacent to building L in the lower loop. You may observe a technician from Fire Protection Inc. (FPI) … Continue reading "Fire Extinguisher & Backflow Testing"
Read More